» what is it?
» product
lenofon Eco Deluxe
lenofon B1
lenofon flexy
lenofon fine
components
installation
» basics acoustics
» downloads
» news, press releases
» references
» contact
lenofon

lenofon Installation phases

  1. Install the support strip sections and fasten them to the bare floor with expansion plugs (at 90° to the installation direction, pitch 60 cm). In the case of false ceilings, the supports are placed using the typical systems for this type of installation or crossed support strips as an alternative.
  2. Position the hemp fibre panel on the wood fibre panel and fasten with 4 screws (such as 40 mm Spax screws). Before placing the insulation layer between the support strips, assemble the wood and fibre panels on the floor or a trestle.
  3. Insert the insulation layer between the support strips using the specific installation slots.
  4. Install the wood fibre panels (which are tongued and grooved on all edges) using normal screws. If the chosen installation scheme needs the panels to be cut, you must create a new tongue or groove, as it is the side junction that ensures sufficient panel fastening.

   Installation phases

HOME | Imprint | Contact | Privacy | E-Mail VAT N. 02525110215
deutsch italiano english